EVALUATION OF OPERATIONAL RISK MANAGEMENT IN TECHNICAL IMPLEMENTATION UNITS OF MOTOR VEHICLES IN SUPPORTING THE CONTINUATION OF LOGISTIC PATHWAYS IN WEST JAVA
Abstract
Risk management is important in supporting all objectives of the West Java Province Motor Vehicle Testing Technical Implementation Unit, namely providing technical safety guarantees for the use of motorized vehicles, trailer trains and postage trains on the road, supporting the realization of environmental sustainability from possible pollution caused by motorized vehicle use. trailer and train carts on the road, and provide public services to the community. Vehicles operated on the road include bus cars, goods cars, articulated cars, train carts, special vehicles and public transportation.
The application of risk management can be used in all fields of work and even in various activities, including decision making, operations, processes, functions, projects, products, services and assets (ISO 31000, 2009). In Indonesia transportation has an important role in supporting national development. Indonesia is an archipelagic country where the development of the transportation sector is designed to support the movement of the economy, national stability and also reduce development inequality between regions by expanding the reach of the distribution of goods and services throughout the archipelago. With the existence of transportation, the economy of the community is more evenly distributed so that it is expected that people's welfare will increase, because the community is easier to get the goods and services needed. One of the important facilities in the land transportation sector is motorized vehicles.
Keywords: Environmental, Sustainability, Pollution, Transportation
Full Text:
PDFReferences
Abram , M. (2007). Kajian Manajemen Risiko Operasi Menggunakan Matriks Risiko Berdasarkan Pendekatan Ama (Advanced Measurement Approaches).
Alma, B. (2010). Pengantar Bisnis. Bandung: Alfabeta.
Andalas Clothing. (2008, 11 11). konveksi-sebagaiu-industri-kreatif-indonesia. Retrieved 11 26, 2015, from www.andalasclothing.com: http://www.andalasclothing.com/11-artikel-konveksi/konveksi-sebagaiu- industri-kreatif-indonesia
Anthony, R. N., & Govindarajan, V. (2005). Sistem Pengendalian Manajemen (Vol. Edisi 11). Jakarta: Salemba Empat.
AS/NZS 4360. (2004). The Australian And New Zealand Standard on Risk .
Badan Pusat Statistik Jawa Barat. (2015). Statistik Transportasi Jawa Barat. Jawa Barat: Dinas Perhubungan Jawa Barat.
Badan Pusat Statistik Kota Cimahi. (2015). Cimahi Dalam Angka - Cimahi In Figure. Badan Pusat Statistik Kota Cimahi.
Cravens, D. W., & Piercy, N. F. (2009). Strategic Marketing. New York: McGraw- Hill.
CRMS Indonesia. (n.d.). MONTE CARLO SIMULATION. Retrieved 04 13, 2017, from crmsindonesia.org: http://crmsindonesia.org/monte-carlo-simulation
CRMS Indonesia. (n.d.). Monte Carlo Simulation. Retrieved 04 13, 2017, from http://crmsindonesia.org: http://crmsindonesia.org/monte-carlo-simulation
Darmawi, H. (2005). Manajemen Risiko. Jakarta: Bumi Aksara.
Dewi, D. (2012). PENERAPAN SISTEM MANAJEMEN RISIKO PADA INDUSTRI NASIONAL SEBAGAI MASUKAN UNTUK PROGRAM PLTN . Prosiding Seminar Nasional Pengembangan Energi Nuklir V, 2012 .
Dinas Perhubungan Provinsi Jawa Barat. (2015). Perhubungan Dalam Angka 2015. J awa Barat, Indonesia: Dinas Perhubungan Provinsi Jawa Barat.
Farahani, R. Z., Rezapour , S. , & Kardar, L. (2011). Logistics Operations and Management Concepts and model. London: Elsevier.
Farid, D., Meybodi , A. R., & Mirfakhraddiny , S. H. (2010). Investment risk management in Tehran Stock Exchange (TSE) using technique of Monte Carlo Simulation (MCS).
Fatmarindah, A. (2010). KAJIAN MANAJEMEN RISIKO OPERASIONAL PADA DIVISI PENERIMAAN, PENIMBUNAN DAN PENYALURAN BBM DI DEPOT UJUNG BERUNG.
Gerbang Ilmu. (2014, 7 14). Pengertian Produksi dan Penjelasan kegiatan Produksi. Retrieved 12 3, 2015, from www.gerbangilmu.com: http://www.gerbangilmu.com/2014/07/pengertian-produksi-dan- penjelasan.html
Global Association of Risk Professionals & Badan Sertifikasi Manajemen Risiko . (2008). Sertifikasi Manajemen Risiko Tingkat 1. Jakarta: Badan Sertifikasi Manajemen Risiko.
Gopher Indonesia. (2015, 3 30). Perbedaan antara Produsen, Distributor, dan Agen. Retrieved 12 3, 2015, from id.gopher.co.id: http://id.gopher.co.id/perbedaan- antara-produsen-distributor-dan-agen/
Griffin, R. W. (2012). Management (Vol. Eleventh Edition ). USA: South-Western.
Han, Z., Huang, S., Li, H., & Ren, N. (2016). Risk assessment of digital library information security: a case study .
Heizer, J., & Render, B. (2015). Manajemen Operasi (Edisi 11 ed.). Jakarta: Selamba Empat.
Heizer, J., & Render, B. (2015). Manajemen Operasi Manajemen Keberlangsungan dan Rantai Pasokan. Jakarta: Salemba Empat.
ISO 31000. (2009). Risk management — Principles and guidelines. International Standard.
Jaringan Dokumentasi dan Informasi Hukum Kementrian Perhubungan. (2015). Peraturan Presiden Republik Indonesia Nomor 40 Tahun 2015 Tentang Kementrian Perhubungan. Indonesia: Jaringan Dokumentasi dan Informasi Hukum Kementrian Perhubungan.
Kanchu , T., & Kumar, M. M. (2013). Risk Management in Banking Sector-An Empirical Study .
Kementrian Perhubungan Republik Indonesia. (2012). Peraturan Pemerintah Republik Indonesia Nomor 55 Tahun 2012 Tentang Kendaraan. Indonesia: Kementrian Perhubungan Republik Indonesia.
Ketua Sub Komite Investigasi Kecelakaan LLAJ. (2016). Data Investigasi Kecelakaan LLAJ Tahun 2010-2016 (Database KNKT, 31 Oktober 2016. Jakarta: Komite Investigasi Kecelakaan LLAJ.
Kusuma, C. (2014, 04 11). PERBANDINGAN COSO ERM-INTEGRATED FRAMEWORK DENGAN ISO31000: 2009 RISK MANAGEMENT – PRINCIPLES AND GUIDELINES. (Associate Researcher CRMS Indonesia ) Retrieved 10 30, 2016, from http://www.crmsindonesia.org: http://www.crmsindonesia.org/knowledge/crms-articles/perbandingan-coso- erm-integrated-framework-dengan-iso31000-2009-risk-managem
Li , L., Bi , S., & Sun , Y. (2015). Risk assessment method for aeroengine multiple failure risk using Monte Carlo simulation.
Li, L., Bi, S., & Sun , Y. (2015). Risk assessment method for aeroengine multiple failure risk using Monte Carlo simulation.
Liputan6.com. (2015, 11 29). Pesanan Innova Baru Nyaris 5.000 Unit. Retrieved 05 18, 2016, from http://otomotif.liputan6.com: http://otomotif.liputan6.com/read/2377222/pesanan-innova-baru-nyaris-5000- unit
Manesme , C. O., Barthe ́le ́my, F., Baroni , M., & Dupuy, E. (2012). Combining Monte Carlo Simulations and Options to Manage The Risk of Real Estate Portfolios.
Meins , E., & Sager , D. (2015). Sustainability and risk Combining Monte Carlo s imulation and DCF for Swiss residential buildings.
Mentri Perhubungan Republik Indonesia. (2015). Peraturan Mentri Perhubungan Republik Indonesia Nomor PM 133 Tahun 2015 Tentang Pengujian Berkala Kendaraan Bermotor. Indonesia: Mentri Perhubungan Republik Indonesia.
Muslich, M. (2007). Manajemen Risiko Operasional Teori & Praktik. Jakarta: Bumi Aksara.
Nazir. (1988). Metode Penelitian. Jakarta: Ghalia Indonesia.
Peraturan Daerah Kota Cimahi No 18. (2011). Penyelenggaraan Perhubungan.
Peraturan Daerah Kota Cimahi. (2008). Dinas Darah Kota Cimahi.
Riopel, D., Langevin, A., & Campell, J. (2005). Logistics System: Design and Optimization. United State: Springer.
Riskfacilitator Pty Ltd. (2015). Countries having adopted ISO31000 as an official risk management standard. Retrieved 10 30, 2016, from http://www.riskfacilitator.com: http://www.riskfacilitator.com/countries- having-adopted-iso31000.html
Romli, F., & Harmin , M. Y. (2015). Use of Monte Carlo method to estimate subsystem redesign risk for complex products: Abstract aircraft redesign case study.
Santoso, T. (2012, 11 17). Risk Management / manajemen risiko Rumah Sakit. Retrieved 10 29, 2016, from http://www.lean-indonesia.com: http://www.lean- indonesia.com/2012/11/risk-management-manajemen-risiko-rumah.html
Slack, N., & Lewis, M. (2008). Operations Strategy.
Tjahjadi, B. (2011). Hubungan Sistem Manajemen Risiko Dengan Ketidakpastian Lingkungan Dan Strategi Serta Dampak Terhadap Kinerja Organisasi .
Wijeratne, W., Perera, B., & De Silva, L. (2014). Identification and assessment risks in maintenance operations .
Yudha, E. (2010). Pengukuran Indeks Kepuasan Masyarakat Pada Pelayanan Pengujian Kendaraan Bermotor Di Dinas Perhubungan Kota Cimahi. Cimahi: Program Pasca Sarjana Magister Ilmu Pemerintahan Universitas Jenderal Achmad Yani.
Yudistira, M. (2010). Kajian Manajemen Risiko Operasional Ujicoba Budaya Alga Merah.
Zaroni. (2015). Transportasi dalam Rantai Pasok dan Logistik. Retrieved from supplychainindonesia.com: http://supplychainindonesia.com/new/transportasi- dalam-rantai-pasok-dan-logistik/
DOI: https://doi.org/10.17509/jare.v1i1.16502
Refbacks
- There are currently no refbacks.
Copyright (c) 2019 Journal of Architectural Research and Education
This work is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.