In construction projects, distribution costs for material procurement support the design process of a projects and are also very influential and determine project planning. It is also necessary to utilize costs as optimally as possible to anticipate losses to the company due to the problem of distributing material from the supply to the projects location. In a project, materials needed in large quantities cannot always be met by just one material source. Because of this, several material sources are needed to meet the needed to meet the needs of a project, for this reason this research was carried out using two transportaastion methods, North West Corner fot initial solution and Stepping Stone for the optimum solution. With the aim of calculating material distribution costs to find optimal prices from galunggung, suli banda, and passo to housing demand locations in Ambon City, namely kusu-kusu, suli and upper halong. From the results of the above topic, it can be concluded that optimizing the distribution costs of brick material to housing in Ambon City using th initial North West Corner method obtained a distribution cost of Rp. 349,200.000 and using and advanced method, namely Stepping Stone which has been optimized, resulting in a cost of Rp. 274,655,000 this results in savings of Rp. 74,545.000.

Keywords:

Cost Optimasion, Housing, Material Distribution, North Westh Corner, Stepping Stone,



Keywords


Cost Optimasion, Housing, Material Distribution, North Westh Corner, Stepping Stone

Full Text:

PDF

References


Ali, N. H., Tarore, H., Walangitan, D. R. O., & Sibi, M. (2013). Aplikasi metode stepping-stone untuk optimasi Perencanaan biaya pada suatu proyek konstruksi (studi kasus: proyek pemeliharaan ruas jalan di Senduk, tinoor, dan ratahan). Jurnal Sipil Statik, 1(8).

Allan McKinnon (2007). “A SURVEY ON THE EFFECTS OF TRANSPORTATION COSTS ON SUPPLY CHAIN PERFORMANCE” .

Andriani, P., & Cipta, H. (2023). Optimasi Biaya Distribusi Kusen Pintu Menggunakan Model Transportasi Northwest Corner Method, Russel Approximation Method, dan Stepping Stone. Jurnal Media Informatika Budidarma, 7(1), 58-65.

Arief, E., & Hardjomuljadi, S. (2020). Analisis Perbandingan Model Kontrak Apbn Dan Apbd Terhadap Model Kontrak Fidic. Konstruksia, 11(2), 8-101.

Batubara, F. H., & Widyasari, R. (2023). Penerapan Metode Transportasi dan Transhipment Menggunakan Linear Programming dalam Efisiensi Biaya Distribusi Barang. Jurnal Media Informatika BUDIDARMA, 7(1), 128-137.

Ferdinandus, A. T., Buyang, C. G., & Kempa, M. (2022). Optimasi biaya distribusi alat berat konstruksi dengan metode Vogel Approximation (VAM) dan stepping stone pada proyek daerah kepulauan di Provinsi Maluku. Jurnal Simetrik, 12(1), 512-519.

Hutahaean, J., Ramdhan, W., & Dhini, P. R. (2023). Optimasi Biaya Pendistribusian Tempe Dengan Menggunakan Metode Stepping Stone Berbasis Android. KLIK: Kajian Ilmiah Informatika dan Komputer, 3(6), 887-892.

Imbang, P. P., Pratasis, P. A., & Walangitan, D. R. (2018). Optimasi Biaya Distribusi Material Dengan Metode Nwc (North West Corner)(Studi Kasus: Pembangunan Gedung Laboratorium Fakultas Teknik Universitas Sam Ratulangi). Jurnal Sipil Statik, 6(10).

Kempa, M. (2022). Implementasi Metode Vogel’s Approximation Method (Vam) Dan Stepping Stone Untuk Optimalisasi Biaya Distribusi Material Besi Beton Pada Daerah Kepulauan Di Provinsi Maluku. JURNAL SIMETRIK, 12(1), 504-511.

Kerlinger, F. N., Koesoemanto, J., & Simatupang, L. R. (1990). Asas-asas penelitian behavioral. Cetakan ke IV. Yogyakarta : Gadjah Mada University press

Nawir, A. H., & Bachmid, S. (2022). Optimasi Biaya Pengadaan Material Pekerjaan Gedung Puskesmas di Kabupaten Pohuwato Provinsi Gorontalo. Jurnal Konstruksi: Teknik, Infrastruktur dan Sains, 1(3), 22-30.

Nugraha, S., & Fauzi, M. (2020). Pengaplikasian Metode Stepping Stone Pada Sofware Lingo Untuk Mencari Optimasi Biaya (Studi Kasus PT Asm Mobil). Journal of Integrated System, 3(1), 49-58.

Nuryatma, N., Wasono, W., & Amijaya, F. D. T. (2024). Aplikasi Pewarnaan Graf untuk Optimalisasi Distribusi Beras di Badan Usaha Logistik (BULOG) Kota Samarinda. Basis: Jurnal Ilmiah Matematika, 3(1), 38-53.

Praba, A. D., Safitri, M., & Faridi, F. (2024). Optimasi Distribusi Produk Pertanian dengan Metode North-West Corner. Jurnal Teknik, 13(1).

Rao, S. S. (2019). Engineering optimization: theory and practice. John Wiley & Sons

Ray, S., Kasturi, K., Patnaik, S., & Nayak, M. R. (2023). Review of electric vehicles integration impacts in distribution networks: Placement, charging/discharging strategies, objectives and optimisation models. Journal of Energy Storage, 72, 108672.

Saragih, N. I., & Juraida, A. (2021). Analisis Perancangan Jaringan Distribusi pada Sebuah Perusahaan Farmasi. Jurnal Penelitian dan Aplikasi Sistem & Teknik Industri (PASTI), 15(2), 118-129.

Soplanit, P. P., Dundu, A. K., & Mangare, J. B. (2019). Optimasi Biaya Distribusi Material Dengan Kombinasi Metode Nwc (North West Corner) Dan Modi (Modified Distribution) Pada Proyek Pembangunan Jembatan Di Sulawesi Utara. Jurnal Sipil Statik, 7(12).

Zulkarnain, A. N. B. I., Lubis, R. S., & Cipta, H. (2024). OPTIMIZATION OF DISTRIBUTION PRODUCT CRIPS BY PACKING WITH TRANSPORTATION METHOD AT UD. KERIPIK RUMAH ADAT MINANG. JURNAL MathEdu (Mathematic Education Journal), 7(1), 118-132.




DOI: https://doi.org/10.17509/k.v22i2.72650

Refbacks

  • There are currently no refbacks.


Copyright (c) 2024 Universitas Pendidikan Indonesia (UPI)

Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

Jurnal Teknik Sipil

KOKOH